The first steel sheet of the electrical substation for the offshore wind farm of Saint-Nazaire (west of France) was cut today at Chantiers de l’Atlantique shipyard in Saint-Nazaire.
The substation will leave the shipyard in the summer of 2021, to be connected with the wind farm in 2022. The substation will collect and transform the electricity produced by wind turbines and transfer it to the shore network, while ensuring remote control of the wind farm.
KOHLER-SOREEL realizes the electrical switchgears, range ATLANT'IS & the secondary electrical panels.